Search here:
 

Case studies

Filters by

Falmec, planning and scheduling the production thanks to an APS

Falmec, always very attentive to innovation, has implemented an important path of innovation to improve its capacity for factory governance.

 

Business growth and fast production planning for HT with CyberPlan

The HT group, which is active in order production and in series of electrical resistors, has drastically reduced the timing required for production planning, while improving various aspects of its supply chain. The interesting case of implementation of the CyberPlan APS software, told by Lorenzo Pettarin, IT manager of the group.

 

LTC – La Triveneta Cavi and the production planning

The case of La Triveneta Cavi’s success and growth of over twenty years, thanks to forward-looking directional choices, from a manual planning to an Advanced Planning and Scheduling System.

 

Lonati plans its global production with CyberPlan

Lonati Spa, leader in the production of circular machines for hosiery, has implemented the CyberPlan APS solution. The Brescia-based company has chosen with a foresight to plan its production in a modern and advanced manner, pursuing the company’s objectives of improvement and efficiency.

 

Santoni, leader of the production of circular machines for socks, with CyberPlan

The desire to guarantee reliable delivery dates to its customers has led Santoni to improve its production planning capabilities by equipping itself with the CyberPlan software.

 

Uniflair reaches a level of excellence with CyberPlan

Before being equipped with the CyberPlan software, production planning in Uniflair was carried out in a traditional way. This placed limits on a production that instead showed itself growing both in terms of size and complexity. The Veneto company therefore felt the need for an instrument that would guarantee a quick, detailed and efficient planning process.

 

Faber plans the cooking hoods manufacturing with CyberPlan

Faber, a historic company active in the production of hoods and aimed at continuous improvement, has drastically reduced the time required for scheduling, achieved an excellent inventory turn-over and an enviable level of service thanks to the Cybertec API.

 

Vimar

We felt the need of an instrument that would have allowed us in having full visibility of the production plan. It also had to take into account specified variables to control the Supply Chain in different points. The goal was to make a solid and more performing planning.

 

ABB

ABB is a pioneering technology leader in electrification products, robotics and motion, industrial automation and power grids. They serve customers in utilities, industry and transport and infrastructure globally.

ABB has used CyberPlan for S&OP planning and scheduling process since more than 10 years ago.

 

Ansaldo Energia

The partnership between Ansaldo Energia and Cybertec began 25 years ago and has strenghtened as the years went by. Many challenges have been successfully faced together, from the internal production changes to the market challenges. CyberPlan has been the strategic instrument used to reach the ambitious business goals ever since.

Interview to the Eng. Nicola Masala, Alternators and Turbines Planning Manager.

 

Are you ready to empower
your Supply Chain with Cybertec?

Case studies

Silca – Dormakaba Group
Vimar
LTL
ABB
ILCAM
Ferplast