Search here:
 

Case studies

Filters by

Forecasting for the filter manufacturing with CyberPlan, for MP Filtri

Eng. Lorenzo Ferrante, responsible for the logistics of the Lombardy multinational MP Filtri, tells the path of improvement of the supply chain and implementation of CyberPlan in order to guarantee a high level of customer service.

 

Clementoni: growth and greater control with CyberPlan

Support the growth process, thanks to specific software solutions to achieve greater production control.

 

Unifarco – Production planning in the pharmaceutical sector

The interview with Patrizia Zanussi and Alessandro Chinellato, respectively responsible for the planning and information systems of Unifarco, highlights the path of innovation and growth of the important Venetian company.

 

Falmec, planning and scheduling the production thanks to an APS

Falmec, always very attentive to innovation, has implemented an important path of innovation to improve its capacity for factory governance.

 

Business growth and fast production planning for HT with CyberPlan

The HT group, which is active in order production and in series of electrical resistors, has drastically reduced the timing required for production planning, while improving various aspects of its supply chain. The interesting case of implementation of the CyberPlan APS software, told by Lorenzo Pettarin, IT manager of the group.

 

LTC – La Triveneta Cavi and the production planning

The case of La Triveneta Cavi’s success and growth of over twenty years, thanks to forward-looking directional choices, from a manual planning to an Advanced Planning and Scheduling System.

 

Palazzetti plans the production with CyberPlan

In recent years, the economic context has forced us to review and contain inventory levels, albeit with the aim of not undermining service levels. The challenge that Palazzetti had set itself was to reorganize and integrate the entire Supply Chain, ...

 

Selle Royal: make the most of strong growth with the APS of Cybertec

Selle Royal has been able to manage the strong growth of production thanks to the APS tool by Cybertec. In fact, CyberPlan has made it possible to optimize the planning and scheduling of the production of the Veneto group.

 

KPI of excellence for Delpharm Novara, with CyberPlan

Delpharm, active in the production of medicines for third parties, gives maximum attention to the customer, respecting the orders in terms of dates and quantities. Paola Moroni, planning manager of the Cerano (NO) plant, told us about the path to upgrade planning and scheduling.

 

Faber plans the cooking hoods manufacturing with CyberPlan

Faber, a historic company active in the production of hoods and aimed at continuous improvement, has drastically reduced the time required for scheduling, achieved an excellent inventory turn-over and an enviable level of service thanks to the Cybertec API.

 

Are you ready to empower
your Supply Chain with Cybertec?

Case studies

Silca – Dormakaba Group
Vimar
LTL
ABB
ILCAM
Ferplast