Search here:
 

Case studies

Filters by

Santoni, leader of the production of circular machines for socks, with CyberPlan

The desire to guarantee reliable delivery dates to its customers has led Santoni to improve its production planning capabilities by equipping itself with the CyberPlan software.

 

Uniflair reaches a level of excellence with CyberPlan

Before being equipped with the CyberPlan software, production planning in Uniflair was carried out in a traditional way. This placed limits on a production that instead showed itself growing both in terms of size and complexity. The Veneto company therefore felt the need for an instrument that would guarantee a quick, detailed and efficient planning process.

 

Selle Royal: make the most of strong growth with the APS of Cybertec

Selle Royal has been able to manage the strong growth of production thanks to the APS tool by Cybertec. In fact, CyberPlan has made it possible to optimize the planning and scheduling of the production of the Veneto group.

 

KPI of excellence for Delpharm Novara, with CyberPlan

Delpharm, active in the production of medicines for third parties, gives maximum attention to the customer, respecting the orders in terms of dates and quantities. Paola Moroni, planning manager of the Cerano (NO) plant, told us about the path to upgrade planning and scheduling.

 

Faber plans the cooking hoods manufacturing with CyberPlan

Faber, a historic company active in the production of hoods and aimed at continuous improvement, has drastically reduced the time required for scheduling, achieved an excellent inventory turn-over and an enviable level of service thanks to the Cybertec API.

 

Marcolin plans and schedules eyewear production with CyberPlan

The manufacturer of high-end eyewear Marcolin reduced lead time and increased business control thanks to CyberPlan, a tool with which it plans production processes.

 

APS and Automotive, the successful story of AP Automotive Products

AP Automotive Products, an automotive company in continuous expansion, had the foresight to move from manual production planning to advanced management through an APS (Advanced Planning and Scheduling software). For over fifteen years, the company has been governing the planning and scheduling of production with CyberPlan.

 

Plastopiave, advanced production planning and cutting-edge production plants

Plastopiave, active in the production of containers, has managed the remarkable dimensional and productive growth thanks to farsightedness and innovation. These two qualities have led the company to innovate the plants and choose the CyberPlan advanced scheduling and scheduling software.

 

Caleffi

Continuous search for new markets has involved a strong expansion of the product portfolio, over the years, resulting in an increase of the production mix that has led the company to the current 7,000 product items.

Interview to the Group Operations Manager – Giorgio Milan and the Group Planning Manager – Filippo Portigliotti.

 

Sipa – Zoppas Industries

How Sipa managed the steady growth with CyberPlan while keeping efficiency and managing the production complexity.

Interview to Michele Visentin, Material Manager of SIPA – Zoppas Industries

 

Are you ready to empower
your Supply Chain with Cybertec?

Case studies

Silca – Dormakaba Group
Vimar
LTL
ABB
ILCAM
Ferplast